A panel of speakers with the most up to date information on the proposed Uinta Basin Railway project kicked off the Uintah Basin Energy Summit on Wednesday. Representatives from Rio Grande Pacific Corporation, the Uinta Basin Railway, and Seven County Infrastructure Coalition made up the panel. The rail is proposed as a public/private partnership sponsored by the 7 County Infrastructure Coalition, privately funded by Drexel Hamilton, and with Rio Grande Pacific Corporation handling the design, operation, and maintenance of the rail. During Wednesday’s presentation, President and Chief Operating Officer of Rio Grande Pacific Corporation Robert Bach explained that Drexel Hamilton is a long term partner and has experience with big oil pipeline projects. Rio Grande comes with 33 years of relevant experience owning 700 miles of short-line rail over 6 western and southern states. Covering a topic of concern for some, Bach stated that based on a study performed a net increase in local jobs is anticipated including trucking jobs, with approximately 100 full-time railroad employees and 50 to 100 terminal employees and short haul drivers. All jobs will have a local and tribal hiring preference. At present, the North Salt Lake refineries are receiving 80,000 barrels of oil per day of Uinta Basin Crude and that is not anticipated to change. On the note of cost, Bach emphasized that there is no public financial risk in this project. The private entities shoulder 100 percent of the risks. Seven County Infrastructure Coalition Executive Director Mike McKee stated that the engineering and EIS costs total $27.9 million dollars funded from mineral lease monies. The construction phase will cost $1.2 to $1.5 billion dollars funded entirely by Drexel Hamilton. There have been 29 possible routes evaluated, narrowed down to 8 with Indian Canyon, Wells Draw, and Craig,Colorado recommended to the Federal Surface Transportation Board who will determine the final route. The break even point for the project is 135,000 barrels per day. Comments can be submitted through September 3rd at www.UintaBasinRailway.com.
Recent Posts
Archives
- July 2022
- June 2022
- May 2022
- April 2022
- March 2022
- February 2022
- January 2022
- December 2021
- November 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- February 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- December 2017
- November 2017
- October 2017
- September 2017
- August 2017
- July 2017
- June 2017
- May 2017
- April 2017
- March 2017
- February 2017
- January 2017
- December 2016
- November 2016
- October 2016
- September 2016
- August 2016
- July 2016
- June 2016
- April 2016
Recent Comments